01 · Who it's for
One platform — different tasks
The platform covers the whole chain: from emissions accounting at a single site to issuing and retiring a carbon unit. Each organisation starts with its own contour and adds the rest as needed.
- GHGMRV
Industry and energy
Emissions by site and source, GHG Protocol reporting, a baseline for modernisation projects.
- CBAMGHG
Exporters to the EU
Specific emissions per tonne of product for CBAM declarants — from the same data as corporate accounting.
- PCAF
Banks and investors
Financed emissions of the lending and investment portfolio under the PCAF standard, with a data quality score.
- MRVMarket
Climate project developers
Project passport, monitoring, three-node review and a package ready for verification and unit issuance.
- Market
Carbon unit buyers
A transparent history of every unit: project, vintage, serial number, transfers and retirement.
- MarketMRV
Government bodies
The national registry receives verified packages, and the claims registry prevents double counting between countries.
Not sure where to start?
Most companies start with GHG: site-level accounting is the basis for CBAM, MRV and unit issuance. You choose the contour after registering.
02 · Products
Five products and registries
One account, tied to the INN and a work email, opens every contour. A company connects only the ones it needs — navigation inside is the same.
- GHGCorporate accountingCompany emissions across Scope 1, 2 and 3: boundary, sites, sources, reporting.carbonplatform.asia — opens in a new tabLearn more in the knowledge base — GHG
- PCAFFinanced emissionsEmissions of the lending and investment portfolio, data quality score 1–5.carbonfin.asia — opens in a new tabLearn more in the knowledge base — PCAF
- MRVProject MRVReduction projects: baseline, monitoring, calculation and preparation for verification.carbonmodel.asia — opens in a new tabLearn more in the knowledge base — MRV
- CBAMCarbon Border AdjustmentEmbedded emissions in goods exported to the EU: installation, calculation, supply.carboncbam.asia — opens in a new tabLearn more in the knowledge base — CBAM
- MarketCarbon marketProject, result, carbon unit and claim — in one chain.carbonmarket.uz — opens in a new tabLearn more in the knowledge base — Market
- REG-PProjects registryProjects, final MRV records and their hashes — in the consortium's private registry
- REG-CClimate claims registryClaims and retirements · access point registry.carbonmarket.asia · [name to be confirmed]
- NAT.National unit registryIssuing units is a state power. Each country has its own server and domain zone
One account opens all five contours — connect only the ones you need.
Create an account03 · How it works
From primary data to a verifiable result
Primary data
The company enters fuel and energy use and attaches invoices and certificates.
CompanyMRV calculation
A versioned module and factors; the input data is stored with the result.
TEROperator review
Data schema, documents, control ratios, report hash.
HPBSIndependent review
Engineering parameters, sources and reproducibility of the calculation.
EIS3 of 3 confirmation
Network confirmations from three validators, publication and a copy on every node.
TER + HPBS + EISExternal verification
An accredited verifier confirms the volume of reductions.
VerifierNational registry
Issuance and serial numbers of units — the country registry's decision.
State
04 · Getting started
First data on the day you register
Registration by INN takes about 5 minutes, setting up the first contour another 15–20. Past periods can be uploaded later, and colleagues invited once sites are created.
Registration by INN
The organisation is found in the registry by its INN; the email is confirmed with a code.
≈ 5 minutes
Choosing a contour
On the home page — GHG, PCAF, MRV, CBAM or Market. The rest can be added later.
1 minute
Sites and staff
Sites, their contours and employees with access to their own sites.
10–15 minutes
First data
Fuel and energy use for a quarter — emissions are calculated right away.
≈ 5 minutes
05 · Consortium
No single organisation can finalise a record on its own
The private registry is run by the consortium's three founders. Roles are separated: calculation, operator control and independent engineering review. Each party has its own node, keys and copy of the registry.
- TER
Total Energy Recovery LLC
Uzbekistan · Project MRV
- Develops the Project MRV module and calculations
- MRV report and technical review of input data
- Its own validator node
- HPBS
HPBS LLC
Uzbekistan · platform operator
- Interface, user and project registration
- Operator review, report hash, initiating and publishing records
- API, Blockchain Gateway and its own node
- EIS
Ecoengineering-stroy LLC
Belarus · independent review
- Independent engineering review of parameters and evidence
- Reproducibility check and independent hash confirmation
- Its own node; recusal in case of a conflict of interest
- 3 of 3final and critical records: issuance, transfer, retirement, correction. The threshold never drops to 2 of 3 — if a node is down, finalisation waits
- > 2/3 · 75%after expansion: regular final records need more than two thirds of validators, critical ones at least 75% including two founders
- Recusala validator with a conflict of interest does not vote; a temporary independent validator is appointed for the record
External verification of a project stays with an independent accredited verifier — none of the three parties replaces it. A node confirmation is not a digital signature: legally binding documents are signed separately. The v2.3 rule set (10 documents) is being signed — until then the network runs as a pilot.
06 · Reliability and security
Every value can be traced and checked
Documents stay off-chain
Reports and calculations are kept in protected storage; the registry holds the SHA-256 hash, status, time and signatures.
Nothing is deleted
A wrong record is corrected by a new record with a reason; the original stays in the history.
Separate keys and nodes
The parties' nodes run on independent infrastructure; private keys are never shared.
Two-factor sign-in
Least-privilege access, an activity log and regular access reviews.
07 · Standards
Methodological basis
- GHG ProtocolCorporate · Scope 3 · Project
- ISO 14064-1organisational inventories
- ISO 14064-2reduction projects
- IPCC 2006factors and methods
- PCAF 2025financed emissions
- IFRS S1 / S2climate risk disclosure
- CBAMEU Regulation 2023/956
- Verra VCS v5voluntary crediting
- Article 6Paris Agreement
08 · Questions and answers
Frequently asked questions
Yes. The organisation chooses a contour on first sign-in and adds the rest later in one click. Sites, users and data are shared — nothing needs to be entered twice.
In the organisation's country: each country has its own server and domain zone. Access is limited to the organisation's employees, within rights granted by the administrator, and to consortium validators for final records.
Yes. Sites and indicators are uploaded from an Excel template, and an API is available for regular transfers. Every uploaded value is stored with its source and supporting document.
The state — through its national registry. The platform prepares a verified package: the calculation, 3 of 3 confirmations and the external verifier's opinion — and hands it to the registry.
A node confirmation records the integrity of an entry in the consortium registry. Legally binding documents are additionally signed with the digital signatures of authorised persons — one does not replace the other.
Every claimed reduction and every unit is recorded in the claims registry with its site, period and owner. A repeat claim for the same tonne is blocked — in any contour and in any country.
09 · Contacts
Let's discuss your task
Tell us what you need to account for and report — we will suggest a contour and a way to connect.
HPBS LLC
Platform operator
Tashkent, 64A Labzak St.+998 90 930-65-66 · info@hpbs.uz
INN 310 758 277
Total Energy Recovery LLC
MRV methodology and calculations
Tashkent, Chilanzar district+998 90 482-97-56 · info@total-energy.uz
INN 311 359 812
Ecoengineering-stroy LLC
Independent engineering review
Minsk, 22 Volodko St., office 5A+375 44 555-44-66 · info@eco-in.by
UNP 191 407 979